2E + Bays
4
5
6
L/Nose
4N1
5N1
5N1
6N1
5N1
6N1
Launch
3p4
5p4
3p4
6p4
3p4
Add
4
E
4
E
4
Launch
4p4
4p4
4p4
Add
E
5
5
Launch
5p4
5p4
Add
E
6
Launch
6p4
Add
E
Complete
Note
Note
Note
Note
Note
Note
by
c,d
c,d
c,d
c,d
c,d
c,d
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Check LR is under LZ given or higher. Remove nose sections as
they pass LRP, observing minimum 5 ft (1.5m) overhang. Leave
last three nose sections in place until far bank end of bridge has
been lowered to ground.
c.
Launch until far bank end of bridge is 9 in (23cm) from LRP, or
end of ETP overhangs CRB by 1.5 ft (0.5m).
d.
Put bridge on ground.
*
Add entire launching nose with LRP secured with tie down strap.
()
Center of gravity.