|
|
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Check LR is under LZ given or higher. Remove nose sections as
they pass LRP, observing minimum 5 ft. (1.5 m) overhang. Leave
last three nose sections in place until far bank end of bridge has
been lowered to ground.
c.
Launch until far bank end of bridge is 9 in. (23 cm) from LRP, or
end of ETP overhangs CRB by 1.5 ft (0.5 m).
d.
Put bridge on ground.
*
Add entire launching nose with LRP secured with tie down strap.
()
Center of gravity.
2-23
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |