|
|
2E + Bays
18
19
20
21
22
L/Nose
8N1
6N1+
6N1 +
6N1 +
6N1 +
3N2
3N2
3N2
3N2
Launch
(8p4)
(9p0)
(9p7)
(10p3)
(10p7)
Position
LZ 5
LZ 2
LZ 4
LZ 5
LZ 6
LRP
Note b
Note b
Note b
Note b
Note b
Launch
15p5
16P5
17P5
18P5
19P5
Remove
FRB
FRB
FRB
FRB
FRB
RRB
RRB
RRB
RRB
RRB
Compl. by
Note c,d
Note c,d
Note c,d
Note c,d
Note c,d
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Check that LR is under LZ given or higher. Remove nose sections
as they pass LRP, observing minimum 5 ft (1.5 m) overhang.
Leave last three nose sections in place until far bank end of bridge
has been lowered to ground.
c. Launch until far bank end of bridge is 9 in (23 cm) from LRP, or
end of ETP overhangs CRB by 1.5 ft. (0.5 m).
d. Put bridge on ground.
* Add given length of launching nose with LRP secured with tie
down strap.
** Nose completed by adding 8th LNH or 6 LNH required for 3N2
(double-story nose).
[ ] Counterweight.
( ) Center of gravity.
2-21
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |