|
|
NOTES:
a. Add LNCG posts, LNCG and nose roller.
b. Check the LR is under LZ given or higher. Remove nose sections
as they pass LRP, observing minimum 5 ft (1.5 m) overhang. Leave
last three nose sections in place until far bank end of bridge has
been lowered to ground
c. Launch until far bank end of bridge is 9 in (23 cm) from LRP, or end
of ETP overhangs FRB by 1.5 ft (0.5 m).
d. Put bridge on ground
* Add entire launching nose with LRP secured with tie down strap
( ) Center of gravity.
2-15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |