Click here to make tpub.com your Home Page

Page Title: NOTES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

NOTES:
a.  Remove curbs, deck units and ramps.
b.  Install RB under bridge minimum 1.5 ft (0.5 m) from end. If mini-
mum bearing is being used, position RB under center hole of
BSB.
c.  Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
d.  Add LNCG posts, LNCG, nose roller and 3 LNH. Reposition LRP
[base 9 in (23 cm) from BSB]. Add LNH 4.
e.  Place BSB to side of site near end of bridge.
f.  Add launching nose sections as required, observing minimum
5 ft (1.5 m) overhang.
g.  Position BP as required to keep bridge off ground.
h.  Remove BSB. clear site.
[ ] Counterweight. (Counterweight BSB connected by shootbolts
only).
( ) Center of gravity,
2-13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business