NOTES:
a.
Remove curbs. deck units and ramps.
b.
Install RB under bridge minimum 1.5 ft (0.5m) from and. If mini-
mum bearing is being used, position RB under canter hole of
BSB.
c.
Position canter of LR (in LRP) 8 ft (2.4 m) from BSB.
d.
Position BP as required to keep bridge off ground.
e.
Add LNCG posts, LNCG, nose roller and 3 LNH. Reposition
LRP [base 9 in (23 cm) from BSB]. Add LNH 4.
f.
Add LNH5 and LLN.
g.
Add LNH5. LNH6 and UN.
h.
Move BP to 2p7. Remove nose roller, LNCG and LNCG posts.
i.
Move BP to 1p7
Remove BSB, Clear site
j.
()
Canter of gravity.
2-11
|