Click here to make tpub.com your Home Page

Page Title: NOTES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

NOTES:
a.
Remove curbs. deck units and ramps.
b.
Install RB under bridge minimum 1.5 ft (0.5m) from and. If mini-
mum bearing is being used, position RB under canter hole of
BSB.
c.
Position canter of LR (in LRP) 8 ft (2.4 m) from BSB.
d.
Position BP as required to keep bridge off ground.
e.
Add LNCG posts, LNCG, nose roller and 3 LNH. Reposition
LRP [base 9 in (23 cm) from BSB]. Add LNH 4.
f.
Add LNH5 and LLN.
g.
Add LNH5. LNH6 and UN.
h.
Move BP to 2p7. Remove nose roller, LNCG and LNCG posts.
i.
Move BP to 1p7
Remove BSB, Clear site
j.
()
Canter of gravity.
2-11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business