4
5
6
7
Bays
8
2p3
Boom
2p3
2p3
2p3
2p3
BSB
5
Remove
5
5
5
Boom
1p7
1p7
1p7
1p7
1p7
Remove
4
4
4
4
4
Boom
1p2
1p2
1p2
1p2
1p2
Note f
Remove
Note f
Note f
Note f
Note f
3
3
3
3
3
BSB
Boom
BSB
BSB
BSB
BSB
Note g
Remove
Note g
Note g
Note g
Note g
2
2
2
2
2
Boom
Note h
Note h
Note h
Note h
Note h
Remove
1
1
1
1
1
Notes
Complete
Notes
Notes
Notes
Notes
i, j
i, j
by:
i, j
i, j
i, j
NOTES:
a. Remove curbs, deck units and ramps.
b. Install RB under bridge min 1.5 ft (0.5 m) from tie end. If mini-
mum bearing is being used, position RB under center hole in
BSB.
c. Add LLN.
d. Install LR 9 in (23 an) from BSB.
e. Put BP as required to keep bridge off the ground.
f. Move BP to 2p7.
g. Move BP to 1p7.
h. BSB over BP.
i . Remove LLN.
j. Remove BSB. Clear site.
[ ] Counterweight. (Counterweight BSB connected by shootbolts
only).
( ) Center of gravity