NOTES:
a Put BSB on RB.
b. Add Bay 1 and put BP under 1p7.
c. Fit nose roller.
d Add Bay 2 and put BP under 2p6.
e Add Bay 3 (with headless pin) and put BP at 3p7.
f. Add LNCG posts, LNCG, nose roller and LLN
g Place BSB to side of site near rear of bridge
h Remove nose sections as they pass LRP, observing 5 ft (1.5 m)
minimum overhang. Leave last three nose sections in place until
far bank end of bridge has been lowered to ground
i. Launch until far bank end of bridge is 9 in (23 cm) from LRP or
BSB overhangs RB by 1.5 ft (0.5 m) If minimum bearing is being
used, launch to center hole in BSB
j. Lower LRP, remove last 3 LNH
k. Put Bridge on the ground
^ Position LRP 9 in (23 cm) from F peg.
[ ] Counterweight. (Counterweight BSB connected by shootbolts
only)
( ) Center of gravity.
* Add LRP and secure with tie down strap.
** Bridge will tip as nose is boomed