Click here to make tpub.com your Home Page

Page Title: NOTES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

NOTES:
a  Put BSB on RB.
b.  Add Bay 1 and put BP under 1p7.
c. Fit nose roller.
d  Add Bay 2 and put BP under 2p6.
e  Add Bay 3 (with headless pin) and put BP at 3p7.
f.  Add LNCG posts, LNCG, nose roller and LLN
g  Place BSB to side of site near rear of bridge
h  Remove nose sections as they pass LRP, observing 5 ft (1.5 m)
minimum overhang. Leave last three nose sections in place until
far bank end of bridge has been lowered to ground
i.  Launch until far bank end of bridge is 9 in (23 cm) from LRP or
BSB overhangs RB by 1.5 ft (0.5 m) If minimum bearing is being
used, launch to center hole in BSB
j.  Lower LRP, remove last 3 LNH
k.  Put Bridge on the ground
^  Position LRP 9 in (23 cm) from F peg.
[ ]  Counterweight. (Counterweight BSB connected by shootbolts
only)
( ) Center of gravity.
*  Add LRP and secure with tie down strap.
**  Bridge will tip as nose is boomed
2-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business