NOTES.
a.
Put BSB on RB.
b.
Add Bay 1 and put BP under 1 p7
c.
Fit nose roller.
d.
Add Bay 2 and put BP under 2p4.
e.
Add Bay 3 (with headless pin) and put BP at 3p7
f.
Add LNCG posts, LNCG. nose roller and LLN
Remove LLN.
g.
Remove LNH sections as they pass LRP.
h
i.
Launch until far bank end of bridge is 9 in (23 cm) from LRP or
BSB overhangs RB by 1.5 ft (0.5 m). If minimum bearing is
being used, launch to center hole in BSB.
Put bridge on the ground.
j.
Position LRP 9 in (23 cm) from F peg.
Center of gravity
()
*
Add LRP and secure with tie down strap