Click here to make tpub.com your Home Page

Page Title: NOTES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

5
8
4
6
7
Bays
Boom
5p3
Add
[BSB,
5D]
Launch
(2p7)
(6p2)
(3p3)
(4p2)
(5p2)
Add
LR^
LR^
LR^
LR^
LR^
Launch
8p7
7p7
Notes
Notes
g, h
g, h
Launch
Note e
Note e
Complete
Notes
Notes
Notes
Note i
Note i
e, f, i
by
e, f, i
e, f, i
NOTES:
a.  Build BSB. LLN. Bay 1 and jackpost on BP and RB.
b.  Boom to center hole of BSB over RB.
c.  Put BP under 1p7
d.  Add Bay 2 and put BP under 2p4.
e
Launch until far bank end of bridge is 9 in (23 cm) from LR or
RBSB overhangs RB by 1.5 ft (0.5 m). If minimum bearing is to
be used, launch to center hole in BSB.
f.
Remove front section of LLN before push launch.
g.  Move counterweight deck units into final position.
h.  Remove counterweight panels and refit BSB from temporary
counterweight position to normal position.
i.
Put bridge on ground.
Position LR 9 in (23 cm) from F peg.
[ ]  Counterweight. (Counterweight BSB connected by shootbolts
only).
( )  Center of gravity.
2-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business