| |
- Technical Manual Operator, Organizational, Direct Support, and General Support Maintenance Manual
- Table 3-1. Operator/Crew Preventive Maintenance Checks and Services
- Table 4-1 Organizational Preventive Maintenance Checks and Services
- Section III. BASIC ISSUE ITEMS
- Distribution
- Reporting of Errors
- Distribution
- General torque .specifications - bolts and screws
- Distribution
- Table of Contents
- Table of Contents
- LIST OF ILLUSTRATIONS
- Chapter 1 INTRODUCTION
- Figure 1-1. Interior bay superstructure, three-quarter view with shipping dimensions.
- Figure 1-2. End bay and ramp superstructure. three-quarter view with shipping dimensions.
- Identification and Tabulated Data cont'd
- Identification and Tabulated Data cont'd
- Difference in Models
- Table 1-1. Curbing Differences.
- Chapter 2 OPERATING INSTRUCTIONS
- Chapter 3 OPERATOR'S MAINTENANCE INSTRUCTIONS
- Figure 3-1. Lubrication points (sheet 1 of 2)
- Section II. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
- Table 3-1. Operator's Preventive Maintenance Checks and Services
- Figure 3-2. Preventive maintenance services, ramp, superstructure, models 2195-1 and 2195-2 (sheet 2 of 3)
- Figure 3-2. Preventive maintenance services, ramp, superstructure, models 2195-1 and 2195-2 (sheet 3 of 3).
- Figure 3-3. Preventive maintenance services, ramp, superstructure, models 2271 and 2272 (sheet 1 of 3).
- Figure 3-3. Preventive maintenance services, ramp, superstructure, models 2271 and 2272 (sheet 2 of 3).
- Figure 3-3. Preventive maintenance services, ramp, superstructure, models 2271 and 2272 (sheet 3 of 3).
- Chapter 4 ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
- Figure 4-2. Superstructure sling assembly
- Figure 4-3. End bay superstructure, removal and installation. (sheet 1 of 3)
- Figure 4-3. End bay superstructure, removal and installation. (sheet 2 of 3)
- Figure 4-4. Superstructure sling assembly hook in place.
- Figure 4-5. Interior bay superstructure. removal and installation.
- Section II. MOVEMENT TO A NEW WORKSITE
- Table 4-1. Organizational Preventive Maintenance Checks and Services
- Figure 4-6. Typical line-hose cylinder application
- Check Valve Replacement
- Figure 4-8. Pilot operated check valve, end bay model no. 2271, removal and installation.
- Figure 4-9. Pilot operated check valve. interior bay model no. 2272, removal and installation.
- Counterbalance Valve Replacement
- Figure 4-11. Curb end bay pilot operated check valve, removal and installation.
- Figure 4-12. Curbing cylinder. removal and installation.
- Figure 4-13. Rotation cylinder, removal and installation. (sheet 1 of 2)
- Figure 4-13. Rotation cylinder, removal and installation. (sheet 2 of 2)
- Pinning Cylinder Replacement
- Figure 4-15. End bay unfolding cylinder, removal and installation
- Figure 4-16. Typical hose clamp, bracket, and spring, removal
- Junction Box Replacement
- Figure 4-18. Junction box removal and installation, superstructure model 2195-1 (sheet 1 of 2).
- Figure 4-18. Junction box removal and installation, superstructure (sheet 2 of 2)
- Section IX. MAINTENANCE OF SUPERSTRUCTURE BRIDGE LAUNCHING AND RETRIEVING EQUIPMENT
- Figure 4-19. Quick disconnect couplings. removal and installation. (sheet 1 of 2)
- Figure 4-19. Quick disconnect couplings. removal and installation. (sheet 1 of 2)
- Figure 4-20. Decking, removal and installation.
- Figure 4-21. Curb arm and rod, removal and installation.
- Figure 4-22. Curbing and torsion shaft, and ramp bracket, removal and installation (sheet 1 of 3)
- Figure 4-22. Curbing and torsion shaft, and ramp bracket, removal and installation (sheet 2 of 3)
- Figure 4-22. Curbing and torsion shaft, and ramp bracket, removal and installation. (sheet 3 of 3)
- Figure 4-23. Typical tapered female locator pin assembly, removal and installation.
- Figure 4-24. Yoke, removal and installation.
- Holddown Bolt Assembly
- Figure 4-26. Holddown bolt assembly, disassembly and reassembly.
- CHAPTER 5 DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
- Table 5-1. Direct Support and General Support Maintenance Troubleshooting -Continued
- Table 5-1. Direct Support and General Support Maintenance Troubleshooting -Continued
- Section III. MAINTENANCE OF BRIDGE LAUNCHING AND RETRIEVING EQUIPMENT
- Chapter 6 REPAIR INSTRUCTIONS
- Figure 6-1. Curbing cylinder, disassembly and reassembly.
- Figure 6-2. Rotation of cylinder, disassembly and reassembly.
- Figure 6-3. Pinning cylinder, disassembly and reassembly
- Figure 6-4. Unfolding mechanism hydraulic cylinder, disassembly and reassembly
- Hydraulic Cylinder Testing
- Section III. SUPERSTRUCTURE REPAIR
- Table 6-2. Interior Bay Superstructure Materials
- Refinishing and Repainting cont'd
- APPENDIX REFERENCES
- REFERENCES cont'd
- APPENDIX B MAINTENANCE ALLOCATION CHART
- Section II. MAINTENANCE ALLOCATION CHART
- Section II. MAINTENANCE ALLOCATION CHART
- INDEX
- INDEX cont'd
- Distribution
- FO-1. Interior bay hydraulic diagram, model no. 2195-1. (sheet 1 of 2)
- FO-1. Interior bay hydraulic diagram, model no. 2272. (sheet 2 of 2)
- FO-2. End bay hydraulic diagram, model no. 2195-2. (sheet 1 of 2)
- FO-2. End bay hydraulic diagram, model no. 2271. (sheet 2 of 2)
- FO-3. Electro-hydraulic functional schematic, interior bay superstructure, model no. 2195-1, grider pinning.
- FO-4. Electro-hydraulic functional schematic, superstructure rotation, model nos. 2195-1 and 2195-2.
- FO-5. Electro-hydraulic function schematic, ramp fold and unfold, superstructure model no. 2195-2.
- FO-6. Electro-hydraulic function schematic, end bay superstructure model no.2195-2 girder pinning.
- FO-7. Electro-hydraulic function schematic, superstructure model nos. 2195-1and 2195-2, raise and lower
- FO-8. Electro-hydraulic schematic, interior bay model no.2195-1 superstructure curbing up and down.
- FO-9. Electro-hydraulic function schematic, end bay superstructure model no. 2195-2, curbing up and down.
- FO-10. Hydraulic function schematic, interior girder pining,superstructure model no. 2272.
- FO-11. Hydraulic functional schematic, superstructure rotation ,model nos. 2271 and 2272.
- FO-12. Hydraulic functional schematic, ramp fold and unfold, superstructure, model no. 2271.
- FO-13. Hydraulic functional schematic, end bay girder pinning superstructure rotation ,model nos. 2271 .
- FO-14. Hydraulic functional schematic, raise and lower , superstructure rotation ,model nos. 2271 and 2272.
- FO-15. Hydraulic functional schematic, interior bay curbing up and down superstructure model nos. 2272.
- FO-16. Hydraulic functional schematic, end bay curbing up and down superstructure rotation ,model no. 2271 .
- TM-5-5420-205-14
- Blank Page
- Blank Page
- Recommended Changes to Equipment Technical Publications
|