Click here to make tpub.com your Home Page

Page Title: Load Tie Breaker and Cables. Refer to figure B-3-3.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 43-0156
Step
Function
Mech
Insp
3
(2)
Spreader bars, slings, and devises.
cont
(a) Coat slings with preservative (8030-00-231-2345)
and allow to dry.
(b) Place spreader bars, slings, and devises into
cradle built on accessory skid and secure.
(c) Place cover over cradle and secure with 12 wood
screws (No.8, 2-in.).
e. Load Tie Breaker and Cables. Refer to figure B-3-3.
(1)  Load Tie Breaker.
(a) Remove the three arc chutes and reinstall the
phase barriers.
(b) Rack air circuit breaker into place and secure
with blocks (5510-00-220-6194) (25-1/2 x 2 x 4)
(17 x 2 x 4) (5-3/4 x 2 x 4) to prevent movement.
(c) Wrap the arc chutes with cushioning (8135-00-855-
6969).
(d) Place arc chutes into a plywood box (37-3/4 x 21 x
32) marked "ARC CHUTES."
(e) Isolate the arc chutes from the sides of the box
and each other by using (21 x 2 x 4) block
(5510-00-220-6194) and seal the box.
(f) Secure the relay covers with wire (9505-00-222-
3829).
(g) Coat electrical contacts and terminals with coat-
ing compound (6850-00-003-5295).
(h) Secure circuit breakers control door with wire
(i) Install protective blocking (5510-00-220-6194)
(25-1/2 x 2 x 4) (17 x 2 x 4) (5-3/4 x 2 x 4)
inside the switch gear cubicle between the relay
panel and exterior access door.
(j) Wrap vents in cushioning (8135-00-855-6969) and
place into a fiberboard box (12 x 8 x 6). Seal
box lid with tape (7510-00-297-6655).
B-3-60

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business