|
|
TM 43-0156
Step
Function
Mech
Insp
FIELD PACKAGING
NOTE
Refer to TM 5-6115-456-15 for identification of items mentioned in these
procedures. Cleaning, drying, application of preservatives, and sealing on
barriers should progress in an uninterrupted series of operations.
1
UNIT RESPONSIBILITY
a. Certify that equipment is free of ammunition and explosives.
b. Assure to the maximum extent possible that items are in
operating condition. Tag each item to indicate the
degree of serviceability.
c. Pack all items of equipment in the original containers.
If the containers are not available, fabricate them in
accordance with the instructions provided for Depot
Packaging. Refer to procedures in Depot Packaging for
packing instructions for Field Packaging.
2
CLEANING AND DRYING
NOTE
Cleaning, drying, application of preservatives, and sealing of barriers
should progress in an uninterrupted series of operations.
Thoroughly clean and dry prior to applying preservatives.
3
PRESERVATION
a. Power Unit.
(1) Diesel Engine.
(a) Coolant System.
1 Fill the coolant system to the proper level with
equal parts (by volume) of antifreeze (6850-00-
181-7940) and clean water.
B-3-48
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |