TM 43-0156
Step
Function
Mech
Insp
2
i.
Packing for the Air Receiver Tank.
cont
(1) Fabricate a MIL-B-26195 box (70-1/2 x 46 x 43-1/2)
in accordance with appendix D-2. Refer to table
(2) Cover base with MIL-B-121 barrier.
(3) Mount air receiver tank on base and secure with 1/2-
x 4-1/2-inch FF-B-584 bolts, NN-W-902 washer, and
FF-N-92 nuts. Refer to figure B-2-5 for location of
blocking.
(4) Place crate top over air receiver tank and secure to
base with FF-W-92 washer and FF-B-561 lag bolts (3/8
x 3-1/2).
(5) Mark container in accordance with appendix E and the
following: Mark all four sides of the container
with 2-inch minimum size letters to indicate
"REUSABLE CONTAINER - DO NOT DESTROY."
j.
Battery Jumper Cables.
(1) Coat cable connectors with MIL-S-8660 silicone.
Wrap with MIL-B-121 barrier and secure with PPP-T-60
tape.
(2) Place in a PPP-B-636 fiberboard box (16 x 6 x 4).
Seal box with PPP-T-76 tape.
(3) Pack with the power and control cables.
k.
Preservation of the Exhaust Pipes, Elbows, and Silencers.
(1) Atomize spray interior surfaces of exhaust pipes,
elbows, and silencers with MIL-L-21260, type I,
grade 30 preservative oil.
(2) Tape off ends with MIL-T-22085 tape. PPP-T-60 tape
may be used as a substitute.
l.
Packing for the Exhaust Pipes for 1500 KW.
(1) Fabricate a MIL-C-104 crate (158 x 55 x 45) and
cradles in accordance with appendix D-3 and figure
Change 1
B-2-30
|