TM 38400/NAVSUP PUB 572/AFMAN 23-210 MCO 4450.14/DLAM 4145.12
Figure 4-103. Example timing of a bulk shipping or receiving operation.
e. In a balanced operation, all men and equipment
load quantity from the gondola car, (2) the time
expended by a straddle truck in moving the unit load
units are synchronized to an acceptable producing pace.
from the off loading point to the stacking point, and (3)
the time required for a forklift truck to stack supplies as
operations. Each must move in balance with productive
deposited by a straddle truck. Related time elements
capabilities of other units in this hypothetical operation.
for each of these operations will form the basis for
To attain this, two cranes are necessary to keep pace
equipment assignment. The illustration is intended to
with one straddle truck and one lift truck. Separate
depict one method of handling a particular commodity.
timings of each segment have established pattern of
It is recognized that other equipment and/or methods
equipment requirements. Considerations in timing are:
may also apply.
(1) the time expenditure for a crane to discharge a unit
4-68
|