|
|
TM 32-5895-227-14&P
CHAPTER 5
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Section I. TOOLS AND EQUIPMENT
5-3 MATERIALS . Materials required are listed in
5-1 TOOLS AND TEST EQUIPMENT . Tools and test
equipment required are listed in Appendix D of this
materials required.
manual. There are no special tools or test equipment
required.
5-2 REPAIR PARTS. Repair parts required are listed
and illustrated in Appendix E of this manual.
Section II. REPAINTING AND REFINISHING INSTRUCTIONS
Preserving Electronics Command Equipment Including
CAUTION
Camouflage Pattern Painting of Electrical Equipment
Do not paint nameplates, panel
Shelters. Paints and finishes will be in accordance with
nomenclature, plastic surfaces, or
SB 11-573, Painting and Preservation Supplies
electrical switches and contacts.
Available for Field Use for Electronics Command
Equipment, and in accordance with AR 746-1,
5-4 REPAINTING,
REFINISHING,
AND
Packaging of Army Materiel for Shipment and Storage.
of the AN/MSQ-71 will be accomplished-in accordance
with TB 43-0118, Field Instructions for Painting and
Section III. LUBRICATION INSTRUCTIONS
AN/MSQ-71.
Refer to TM 11-5815-206-12
for
5-5
GENERAL. There is no lubrication order for the
lubrication of Teletypewriter Set AN/TGC-14.
Section IV. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
71 not ready (Red) for its primary mission in column
5-6 SCOPE.
Organizational
preventive
five.
Footnotes are added to indicate special
maintenance checks and services (PMCS) are
requirements when unusual conditions exist.
performed weekly, monthly, and quarterly as authorized
b. Records and reports will be in accordance with
by the Maintenance Allocation Chart (MAC). These
TM 38-750.
periodic checks and services help maintain the
c. All organizational PMCS will be performed at
AN/MSQ-71 in operating condition. Defects that cannot
initial installation and when the equipment is reinstalled
be corrected will be reported to direct support
after removal.
maintenance.
column one, the inspection interval in column two, the
item to be inspected in column three, the procedure in
column four, and the reasons for reporting the AN/MSQ-
5-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |