Quantcast INSTALLATION (Cont) - TM-9-2350-238-20-20309

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
INSTALLATION - TM-9-2350-238-20-20308
Up
TM-9-2350-238-20-2 Crane (CAB) Components Recovery Vehicle Full-Tracked: Light Armored M578 (
Next
MAINTENANCE OF CAB TO SLIP RING GROUND ELECTRICAL LEAD.
TM
9-2350-238-20-2
Failure
to
remove
or
disconnect the  batteries  before  removing  or  installing  any
electrical wiring harness or lead may  result  in  injury  or  damaged  equipment.
1 Install  electrical  level  wind  solenoid to  sensing  switch  and  left  rectifier  branched  wiring
harness  (1).  Connect  ground  wire  (2)  and  install  using  washer  (3)  and  screw  (4).
2 Connect electrical lead 480 (5) on solenoid valve (6).
3 Connect electrical lead 480 (7) on rectifier (8).
4 Install clamps, fasteners, and grommets on electrical level wind solenoid to sensing switch
and
left
rectifier
branched
wiring
harness
(1).
5 Connect electrical lead 480 (9) on left level wind sensing switch (10).
2-269

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.