Quantcast INSTALLATION - TM-9-2350-238-20-20294

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Removal - TM-9-2350-238-20-20293
Up
TM-9-2350-238-20-2 Crane (CAB) Components Recovery Vehicle Full-Tracked: Light Armored M578 (
Next
MAINTENANCE OF LAMP AND SWITCH FLASHER LIGHT ELECTRICAL LEAD ASSEMBLY
TM
9-2350-238-20-2
S WI T C H T O S E N S I N G S W I T C H E S E L E C T R I C A L
2-75.
MAINTENANCE  OF  LEVEL
WIND
LEAD ASSEMBLY (CONT).
INSTALLATION
Failure
to
remove
or
disconnect
the batteries before removing or
installing  any  electrical  wiring
harness or lead may result in in-
jury
or
damaged
equipment.
1 Install
level
wind
switch
to
sensing
swit-
ches
electrical
lead
assembly
(1).
Connect
electrical lead 480 (2) to level wind
switch  (3).
2 Install
clamps,
fasteners,
and
grommets
on level wind switch to sensing switches
electrical  lead  assembly  (1).
3 Connect  two  electrical  leads  480  (4)
to
right and left sensing switches (5).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.