Quantcast INSTALLATION - TM-9-2350-238-20-20283

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
REMOVAL - TM-9-2350-238-20-20282
Up
TM-9-2350-238-20-2 Crane (CAB) Components Recovery Vehicle Full-Tracked: Light Armored M578 (
Next
MAINTENANCE OF SLIP RING TO CIRCUIT BREAKERS AND RADIO POWER DISCONNECT  BRANCHED  WIRING  HARNESS.
TM
9-2350-238-20-2
INSTALLATION
Failure
to
remove
or
disconnect
the batteries before removing or
installing  any  electrical  wiring
harness or lead may result in in-
jury  or  damaged  equipment.
1 Install  dome  light  feed  branched  wiring
harness  (1)  and  connect  electrical  lead  38
plug connector (2) to circuit breaker (3).
2 Connect  electrical  lead  137
plug
connec-
tor (4) to utility outlet (5).
3 Connect  electrical  lead  325  plug  connec-
tor (6) to flasher signal switch (7).
4 Install
clamps
and
fasteners
securing
dome light feed branched wiring harness
(1).
5 Connect  two  electrical  lead  38  plug  con-
nectors (8) to two cab dome lights (9).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.