Quantcast Installation - TM-9-2320-360-20-20256 2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
ELECTRIC GAGE REPLACEMENT
Up
TM-9-2320-360-20-2 Truck Tractor M1070 8x8 Heavy Equipment Transporter (HET) NSN
Next
RHEOSTAT SWITCH REPLACEMENT
TM 9-2320-360-20-2
7-18. ELECTRIC GAGE REPLACEMENT (CONT)
b. Installation
NOTE
Gage is installed properly when lamp
opening is facing top of instrument
panel.
(1) Install gage (1) in instrument panel (2).
(2) Position mounting bracket (3) on gage (1).
(3) Install two washers (4) and nuts (5) on
mounting bracket (3).
(4) Install lamp (6) and socket (7) as one unit
in gage (1).
NOTE
Voltmeter only has two terminals.
(5) Install wires (8) on terminals of gage (1).
c. Follow-On Maintenance
(1) Install instrument panel (para 7-13).
(2) Start engine (TM 9-2320-360-10).
(3) Check
operation
of
electric
gage
(TM 9-2320-360-10).
(4) Shut off engine (TM 9-2320-360-10).
7-56

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.