Quantcast Installation - TM-9-2320-360-20-20252 2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
TOGGLE SWITCH/LIGHT REPLACEMENT
Up
TM-9-2320-360-20-2 Truck Tractor M1070 8x8 Heavy Equipment Transporter (HET) NSN
Next
TURN SIGNAL HANDLE/DIMMER SWITCH REPLACEMENT
TM 9-2320-360-20-2
7-16. TOGGLE SWITCH/LIGHT REPLACEMENT (CONT)
b. Installation
(1) Install applique (1) on switch (2).
NOTE
When properly installed, switch
will seat flush against instrument
panel.
To install light assembly only, do
steps (4) and (5).
(2) Install switch (2) on instrument panel (3).
(3) Install connector (4) into switch (2).
(4) Install light assembly (5) in connector (6).
(5) Install light assembly (5) and connector (6)
as one unit in switch (2).
NOTE
Do step (6) only if engine brake
switch(es) or DDEC III diagnostic
request switch were removed.
(6) Install 3 panels (7) on electronic control
box (8) with 19 screws (9).
c. Follow-On Maintenance
(1) Install instrument panel (para 7-13).
(2) Start engine (TM 9-2320-360-10).
(3) Check operation of toggle switch/light
(TM 9-2320-360-10).
(4) Shut off engine (TM 9-2320-360-10).
7-52 Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.