Quantcast Installation cont'd - TM-9-2320-360-20-20190 2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation - TM-9-2320-360-20-20189
Up
TM-9-2320-360-20-2 Truck Tractor M1070 8x8 Heavy Equipment Transporter (HET) NSN
Next
FAN CLUTCH TO ENGINE BLOCK HOSE REPLACEMENT
TM 9-2320-360-20-2
6-11. FAN BELT REPLACEMENT (CONT)
(7) Turn two nuts (12) in on tie rods (13) to tilt
radiator (14) rearward.
NOTE
When  tie  rods  are  properly
installed,
clearance
between
radiator and hardlift bracket is
1.75 in. (4.45 cm).
Do not use nuts on large end of
mount to tighten. Only use nuts
on small end to tighten and
mushroom mount.
(8) Install two washers (15), new lockwashers
(16), and nuts (17) on tie rods (13).
(9) Install wire no. 1788 (18) on sending unit
(19) with new lockwasher (20) and screw
(21).
(10) Install wire no. 890 (22) on sending unit
(19) with new lockwasher (23) and nut
(24).
d. Follow-On Maintenance
Install alternator belts (para 7-7).
6-56

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.