Click here to make tpub.com your Home Page

Page Title: INSTALLATION (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-285-24-1
2-25.
STARTING SYSTEM MAINTENANCE (CONT)
a.
Solenoid and 70 AMP Circuit Breaker (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (cont)
4
g. Terminal (19)
Connect
To circuit breaker (40)
(cont)
and red wire
(15)
h. Lock washer
Install and
Secures terminal (19)
(18) and
tighten
screw (17)
i.  Plate (33)
Position
On starter
j.  Two capscrews
Install and
Secures plate (33)
(32)
tighten
k.  Solenoid (31)
Support
l.  Terminal (26)
Connect
To solenoid (31)
and black
wire (8)
m. Washer (25)
Install and
and nut (24)
tighten
n. Tan/green wire
Connect
To solenoid (31)
(30)
o. Lock washer (29)
Install and
and nut (28)
tighten
p. Terminal (22)
Connect
To solenoid (31)
and black
wire (23)
q. Washer (21) and
Install and
nut (20)
tighten
r.  Terminal (16)
Connect
To solenoid (31)
and red wire
(11)
s.  Terminal (14)
Connect
To solenoid (31)
and red wire
(15)
t.  Washer (13)
Install and
and nut (12)tighten
u. Terminal (4)
Install
Tighten to 13-17 pounds foot
and capscrew
(43)
v.  Shield (3)
Position
w. Two capscrews
Install
Connect terminal (4) of black
(2) and nuts
and tighten
wire (23) to one capscrew
(1)
x.  Terminal (7)
Connect
To starter solenoid
and black
wire (8)
y.  Lock washer (6)
Install and
and nut (5)
tighten
2-207

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business