Click here to make tpub.com your Home Page

Page Title: INSTALLATION (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-285-24-1
2-15.
COOLING SYSTEM MAINTENANCE (CONT)
c.
Hoses (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (cont)
8
e. Clamp (7)
Tighten
(cont)
f. Clamps (3 and
Position
On hose (6)
5)
g. Hose (6)
Position
h. Elbow (4)
Install
i. Two clamps (1)
Position
On hose (2)
j. Hose (2)
Install
k. Clamps (1, 3,
Tighten in
5, and 7)
sequence as
listed
9
Oil cooler
a. Elbow (12)
a. Tape
Wrap threads with Teflon tape
b. Install
b. Clamp (11)
Position
On hose (16)
c. Hose (16)
Connect to
elbow (12)
and route
to radiator
d. Clamp (11)
Tighten
10
Thermostat
a. Clamps (17 and
Position
On hose (19)
housing18)
(right
b. Hose (19)
Install
side) and
c. Clamps (17 and
Tighten
radiator
18)
11
Thermostat
a.
Clamp (14)
Position
On hose (16)
housing
b.
Hose (16)
Install
On radiator
(left side)
c.
Clamp (14)
Tighten
and radia-
d.
Clamps (20 and
Position
On hose (23)
tor
21)
e. Hose (23)
Install
f. Clamps (20 and
Tighten
21)
g. New tie straps
Install
In locations noted during
(15 and 22)
removal
NOTE
In steps 11h thru 11j below, wrap male threads of fittings (26 thru 28) with Teflon tape before
installation.
2-147

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business