Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-3
AIR HORN AIR LINES - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION - CONTINUED
Close.
Instrument panel
25. Cab
Using pocket knife, cut from bulk stock
New air line 39 (1)
28.
same length as old air line 39 (l).
Push in and using plastic hammer, seat.
Two inserts (4)
27. Two elbows (2)
and (3)
Slide on.
Nut (5) and new
28. Air line 39(1)
sleeve (6)
a. Lube end lightly with soap and push in
Air line 39 (1)
29. Elbow (2)
until seated.
b. Screw on and tighten using 9/16-inch
wrench.
Slide on.
Nut (5) and
30. Air line 39(1)
new sleeve (6)
Lube end Iightly with soap and push in
a.
Air line 39 (1)
31. Elbow (3)
until seated.
Screw on and tighten using 9/16-inch
b.
wrench.
TA240792
4-1284

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business