Click here to make tpub.com your Home Page

Page Title: AIR HORN AIR LINES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-3
AIR HORN AIR LINES
This task covers:
c. Installation (page 4-1262)
a. Removal (page 4-1260)
b. Repair (page 4-1262)
INITIAL SETUP
Materials/Parts Continued
Tools
Soap, liquid (item 14, appendix C)
Hammer, plastic
Tag marking (item 18, appendix C)
Knife, pocket
Tubing, nylon air brake, 1/4-inch OD
Pliers,  diagonal-cutting
(as required)
Pliers, long-nose, round
Wrap, tie (item 24, appendix C)
Pliers, slip-joint, straight-nose
Wrench, open-end, 9/16-inch
Personnel Required
One
Materials/Parts
Sleeve, compression, tube, 1/4-inch
inside diameter (two required)
ACTION
ITEM
REMARKS
LOCATION
REMOVAL
WARNING
Make sure ail pressure is drained from air system before disconnecting air lines. Parts
under pressure can, when removed, fly off with great force causing injury to personnel.
NOTE
Tag lines according to general maintenance instructions (page 4-1).
Drain (TM 9-2320-270-10).
Air system
1.
Using 9/16-inch wrench, unscrew and pull
Air line 39 (2)
2. Elbow (1)
out.
Using long-nose pliers, pull out.
insert (3)
3. Air line 39 (2)
or elbow (1)
4-1260

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business