Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-3
TOWING PINTLE - CONTINUED
ACTION
ITEM
REMARKS
LOCATION
INSTALLATION
CAUTION
Do not wedge wrench against lights to hold bolts. Have assistant hold wrench. Putting
pressure on taillight or blackout Iight can break It.
Inner bracket (2)
Place in position.
26. Frame (1)
and outer bracket (3)
Screw in and tighten using 1 1/8-inch
Two nuts (4) and
27. Inner bracket (2)
socket, 10-inch extension, 1/2-inch
two screws (5)
and outer
drive handle, and 1 1/8 -Inch wrench.
bracket (3)
Pintle (6)
Put in.
28. Outer bracket (3)
NOTE
Have assistant use pry bar to keep pintle from turning while tightening slotted nut. Pintle
lock must be closed and latched.
Two washers (7)
Put on.
29. Pintle (6)
Slotted nut (8)
a. Put on.
30.
b. Using 2 1/4-inch socket, 10-inch
extension, l-inch drive handle, and pry
bar, tighten.
c. Back off just enough so pintIe turns
freely.
Cotter pin (9)
Using pliers, put in.
31. Slotted nut (8)
Three grease
Using grease gun, lubricate
32. Pintle (6) and
(LO 9-2320-270-12).
fittings (10)
outer bracket (3)
4-1050

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business