Click here to make tpub.com your Home Page

Page Title: DISASSEMBLY CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-2
PRIMARY AIR RESERVOIR - CONTINUED
.
ACTION
REMARKS
ITEM
LOCATION
DISASSEMBLY CONTINUED
NOTE
Do not disassemble parts unless inspection shows need for replacement.
Using 1 1/16-inch wrench, unscrew and
Elbow (2)
14. Check valve (1)
take off.
Using 1 1/16-inch wrench, unscrew and
Adapter (3)
15.
take off.
CLEANING
Clean according to general maintenance
All parts
16.
instructions (page 4-1).
inspection/REPLACEMENT
WARNING
Do not attempt to repair damaged air reservoir. When pressurized, it may explode
causing injuries to personnel.
Inspect for damage.
Primary
17.
Light rust and small dents are the
reservoir (4)
only acceptable damage.
Inspect according to general maintenance
All threaded parts
18.
instructions (page 4-1).
ASSEMBLY
NOTE
Skip steps 19 and 20 if parts were not disasssembled and replaced.
a. Wrap threads with teflon tape
Adapter (3)
19. Check valve (1)
(page 4-1).
b. Screw in and tighten using 1 1/16-inch
wrench.
4-672

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business