Click here to make tpub.com your Home Page

Page Title: INSTALLATION CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2820-270-20-1
OPTICAL RIBBON AND LIGHT SOURCE - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION CONTINUED
NOTE
All labels are installed the same way. Install in order listed.
Push into place from front.
Bezel (3)
38. Instrument panel
(1) below light
switch (2)
Lift enough to clear nib (5) on decal (6).
Tab (4)
37. Bezel (3)
a. Slide into bezel (3).
LIGHTS decal (6)
38.
b. Repeat steps 36 thru 38a and install
CL LPS label (7), DOME label (8),
BEACON label (9), WORK LITE label
(10), WIPERS label (11), and ENG
stop label (12).
4-484

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business