Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
TRANSMISSION ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
40.
Oil pan (12) and
Oil level gage tube
Put in position.
bracket (13)
(14) and clamp (15)
41.
Clamp (15) and
Screw (16) and
Screw in, and tighten using 9/16-inch
bracket (13)
nut (17)
socket and ratchet handle with 1/2-inch
drive, and 9/16-inch open-end wrench.
42.
Oil pan (12)
Oil level gage
Screw in, and tighten to - 25 ft-lb
tube flare nut (18)
(14 - 34 N m) of torque using 1 1/8-
inch open-end crowfoot wrench and torque
wrench with 1/2-inch drive.
TA238383
2-645

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business