Quantcast INSTALLATION - CONTINUED - TM-9-2320-269-34-10510

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
INSTALLATION - CONTINUED - TM-9-2320-269-34-10509
Up
TM-9-2320-269-34-1 Truck Telephone Maintenance Utility C/S 36 000 GVW 6 X 4 W/WN WI/E M876 (NSN
Next
INSTALLATION - CONTINUED - TM-9-2320-269-34-10511
TM 9-2320-269-34-1
ANTILOCK WIRING HARNESS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
33.
Vehicle right
Wiring harness (7)
Route harness (7) along frame (6).
frame (6)
34.
Clamps (8) and (9)
Wiring harness (7)
Spread clamp and put over harness (7)
using 3/8-inch flat-tip screwdriver.
35.
Brackets (10)
Clamps (8)
Put in position on brackets (10) and (11).
and (11)
and (9)
36.
Clamps (8) and (9)
Screws (12) and
Screw on, and tighten using two 7/16-inch
(13), washers (14)
open-end wrenches.
and (15), and nuts
(16) and (17)
37.
Vehicle left
Harness (19)
Route rear control valve and left rear
frame (18)
leads to frame.
38.
Rear air control
Harness
Push together.
valve connector (20)
connector (21)
TA238247
2-493

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.