Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
ENGINE WIRING HARNESS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
43.
Neutral start
Connectors (2)
Connect wires as tagged during removal.
switch wires (1)
44.
Wire clamp (3)
Neutral start
Put in position.
switch wires (1)
45.
Nut (4) and
Screw In, and tighten using two 1/2-
screw (5)
inch open-end wrenches.
NOTE
FOLLOW-ON MAINTENANCE:
1.  Connect battery cables (TM 9-2320-269-20-1).
2.  Check operation of starting motor, alternator, water temperature sending
unit, oil pressure sending unit, and neutral start switch (TM 9-2320-269-10).
3.  Close left and right side hood panels (TM 9-2320-269-20-1).
4.  Install transmission cover (TM 9-2320-269-20-2).
TASK ENDS HERE
2-480

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business