Click here to make tpub.com your Home Page

Page Title: ASSEMBLY - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
STARTING MOTOR - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
ASSEMBLY - CONTINUED
108.
Field frame (5)
Solenoid switch
Place in position lining up holes.
assembly (13)
109.
Solenoid switch
Four screws (14)
Using 6-point 7/16-inch socket and
3/8-
assembly (13)
inch drive ratchet handle, sc rew in and
tighten.
110.
Solenoid switch
Lead (16), clamp
Screw in, and tighten using 5/16-
inch
assembly (13) and
(17), and screw (18)
inch socket and speeder handle.
terminal (15)
111.
Field frame terminal
Terminal
Put in position.
(19) and solenoid
connector (21)
terminal (20)
112.
Terminal
New lockwasher (22) Screw on, and tighten using 3/4-
inch
connector (21)
and nut (23) socket and ratchet handle with 1/2-inch
drive.
113.
New lockwasher (24)
Screw on, and tighten using 3/4- inch
and nut (25)
socket and ratchet handle with 1/2-inch
drive.
TA238211
2-451

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business