Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
FRONT CRANKCASE COVER - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
24. Front crankcase
New packing (2),
a.
Put in place.
cover (1)
air compressor base
b.
Screw in, and tighten using 9/16-inch
(3) three new lock-
socket and ratchet handle with 1/2-
washers (4) and
inch drive.
screws (5)
25.
Two new lockwashers
Screw in until snug.
(6) and screws (7)
26.
Nine screws (8),
Using 9/16-inch socket and torque wrench
(9), (10), (11),
with 1/2-inch drive, tighten to 25 - 35
and (7)
ft-lb (34 - 47 N m) of torque.
27.
New oil seal (12)
a.
Lubricate cover (1) bore with clean
engine oil.
b.
Using front cover oil seal installer
and plastic-face hammer, drive on.
The seal is seated when Inner
shoulder on tool contacts the
machined surface on cover.
TA238030
2-202

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business