Click here to make tpub.com your Home Page

Page Title: INSPECTION/REPLACEMENT - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
FLYWHEEL HOUSING - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSPECTION/REPLACEMENT - CONTINUED
7.
Flywheel housing (1)
a.
Look for cracks, breaks, and large
dents.
b.
Look for damaged threads.
ASSEMBLY
NOTE
Do not do step 8 unless dowel pins were removed.
8.
Flywheel housing (1)
Two new dowel
Using plastic-face hammer, tap In.
pins (6)
INSTALLATION
9.
Cylinder block (4)
New gasket (5) and  a.
Attach lifting equipment.
flywheel housing (1)
b.  Using lifting equipment, put in
position.
10.
Flywheel
Two washers (3)
Screw In, and tighten using 13/16-
inch
housing (1)
and screws (2)
socket and ratchet handle with 112-
inch
drive.
TA237995
2-139

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business