Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
CYLINDER HEADS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
32.  Cylinder head (1)
Bracket (2) with
Put in position.
wires (3)
33.
Bracket (2)
New lockwasher (4)
Screw in, and tighten using 9/16-inch
and screw (5)
socket and ratchet handle with 1/2-inc h
drive.
34.
Water bypass
Elbow (7)
Screw in, and tighten using pipe wrench.
cover (6)
35.
Cylinder head (1)
New gasket (8)
Put in position.
and water bypass
cover (6)
36.
Water bypass
Two new lockwashers
Screw in, and tighten using 9/16-inch
cover (6)
(9) and screws (10)
socket and ratchet handle with 1/2-inch
drive.
37.
Bracket (11)
Put in place
38.
Bracket (11)
New lockwasher (12)
Screw in, and tighten using 9/16-inch
and screw (13)
socket and ratchet handle with 1/2-inch
drive.
39.
Two elbows (7)
Water bypass
Screw on, and tighten using 15/16-inch
and (14)
pipe (15)
open-end wrench.
NOTE
Steps 40 and 41 apply to left side cylinder head.
40.
Water bypass
Bracket (17)
Put in place.
cover (16)
41.
Bracket (17)
New lockwasher (18)
Screw in, and tighten using 9/16-inch
and screw (19)
open-end wrench.
2-112

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business