Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
ENGINE ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
109. Bracket (17)
Clamp (18) and
Place in position.
wires (19)
110. Clamp (18)
Nut (20), new lock-
Screw in, and tighten using two 7116-inch
washer (21) and
open-end wrenches.
screw (22)
111. Two connectors (23)
Heater return hose
a.
Check tags for proper location and take
(24) and inlet hose
off.
(25) with two
b.
Twist and push on.
clamps (26)
c.
Slide clamps (26) into position.
112. Two clamps (26)
Two screws (27)
Using 114-inch flat-tip screwdriver,
tighten.
113. Fuel return pipe
Tee-to-side member
a.
Check tag for proper location and take
tee (28)
pipe (29)
off.
b.
Screw on, and tighten using 5/8-inch
open-end wrench.
TA237956
2-79

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business