Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
ENGINE ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
98.
Power take-off
U-joint (13)
a.
Raise shaft (12).
bearing cap assembly
b.
Using 2-lb ball-peen hammer and 1/2
(11) and shaft (12)
inch brass driftpin, tap into place.
99.
U-joint (13)
Screw (14)
Screw in, and tighten using 9/16-inch
open-end wrench.
100. Two setscrews
a.
Screw in, and tighten using 7116-inct
(15) and two new
open-end wrench.
lockwires (16)
b.
Put on lockwires (16), and secure
(page 2-46) using angle -nose slip-
joint pliers.
101. Transmission oil
Plug (18)
Push in.
pressure switch (17)
TA237954
2-77

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business