Quantcast INSTALLATION - CONTINUED - TM-9-2320-269-34-10089

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
INSTALLATION - CONTINUED - TM-9-2320-269-34-10088
Up
TM-9-2320-269-34-1 Truck Telephone Maintenance Utility C/S 36 000 GVW 6 X 4 W/WN WI/E M876 (NSN
Next
INSTALLATION - CONTINUED - TM-9-2320-269-34-10090
TM 9-2320-269-34-1
ENGINE ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
78.
Engine (1)
Flywheel housing
a.
Make sure engine has been securely
(2) and crankcase
attached to vehicle.
front cover (3)
b.
Take off hoist.
c.
Take off two lifting plates.
79.
Two adapters (4)
Two hose
a.
Check tags for proper locations.
assemblies (5)
b.
Take off tags.
c.
Screw on, and tighten using 1/2-inch
and 3/4-inch open-end wrenches.
80.
Connector (6)
Connector (7)
a.
Check tag for proper location.
b.
Take off tag.
c.
Push together.
81.
Light harness
Connector (9)
a.
Check tag for proper location.
plug (8)
b.
Take off tag.
c.
Push in.
TA237949
2-72

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.