Quantcast SECTION IV. PRINCIPLES OF OPERATION cont'd

 

Click here to make tpub.com your Home Page

Page Title: SECTION IV. PRINCIPLES OF OPERATION cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
SECTION IV. PRINCIPLES OF OPERATION
Up
TM-9-1375-224-12 Demolition Kit Blasting: Fighting Position Excavator M300 (NSN 1375-01-429-3510) Manual
Next
CHAPTER 2 OPERATING INSTRUCTIONS - TM-9-1375-224-120024
6.
The primaline is attached to the blasting
cap using an M9 holder.
7.
A sandbag is placed over the M9 holder to
reduce signature and missile hazard.
8.
After laying the shock tube to the firing
point (approx 25 m away), the M81 is con-
nected to the end of the shock tube.
9.
The explosive is initiated by pulling the
ring on the M81 igniter.
10. The loosened dirt is removed with an
entrenching tool and the fighting position
is shaped.
1-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.