| ||||||||||
| 
 
  | 
![]() TM 9-1300-277 
Table 9-2. Conventional Ammunition Demilitarization Facilities and Capabilities (AMCCOM)-Continued 
LEXINGTON BLUE-GRASS ARMY DEPOT ACTIVITY 
Disassembly 
facilities 
Washout 
furnace 
Detonation 
Open burning 
Bldgs 550,555,562- 
APE 1300 Plant with 
Bldg 273- 
30 detonation sites 
Burning area. 
Each 18,000 sq ft 
pilot model char- 
Small Arms Breakdown 
with electrical fir- 
(Bldgs 550,555 
coal filter system 
Facility. 
ing system. 
each have powder 
installed. Addi- 
APE 1236 W/KIT E010 
Meteorological conditions 
collection systems.) 
tional charcoal 
dictate when munitions 
Center substantial 
column required. 
can be burned. 
wall with operational 
Detonation restric- 
bays. 
Bldg 275- 
tion: 50 lb below 
Power conveyors. 
Contaminated Waste 
ground with 4 feet 
Full complement of APE 
Processor (small 
earth cover; 100 
disassembly and 
unit) will be 
lb below ground 
breakdown equipment. 
completed sometime 
with 6 feet earth 
this year. 
cover. 
Bldg 1166- 
Disassembly barricade 
Under ideal weather 
for remote disas- 
conditions, the 
sembly of items with 
upper limit may 
less than 50 lb of 
be used. 
explosive. 
NOTE: Upper limit 
Bldg 1319- 
seldom used because 
Disassembly barricade 
of blast pressures 
for remote disas- 
affecting neighbor- 
sembly of items with 
ing residences. 
more than 50 lb of 
explosive. 
The only open burning permitted by the Kentucky Environmental Protection Agency is for propellant which has reached a point of unacceptable stability. 
Detonation is restricted to H.E. loaded munition on a specific item-by-item basis by the Kentucky Environmental Protection Agency. 
Change 2 9-8 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |