Click here to make tpub.com your Home Page

Page Title: Section 10. JUNCTION BOX ASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1220-220-34
Section 10. JUNCTION BOX ASSEMBLY
4- 29.
JUNCTION BOX ASSEMBLY MAINTENANCE PROCEDURES INDEX
Task
Reference (para)
Removal
4-30
Disassemblv
4-31
Assembly
4-32
Installation
4-33
4-30.
JUNCTION BOX ASSEMBLY REMOVAL
APPLICABLE CONFIGURATIONS: M10, M10AI, M10A4, M10A5, and M10A6
TOOLS:
1/2" box end wrench
1/2" open end wrench
PERSONNEL:
One
EQUIPMENT CONDITION: Junction box assembly mounted in turret
PRELIMINARY PROCEDURES: Remove ballistics drive (para 4-4. frames 4 and 5)
FRAME 1
Step
Procedure
1.
Using 1/2"box end wrench, remove two screws (I) and two lockwashers (2) holding
bracket (3) to turret wall.
2.
Remove junction box (4).
3.
Using 1/2' box end wrench and l/2"open end wrench, remove two nuts (5), two lock-
washers (6), and two screws (7) holding bracket (3) to junction box (4).
4.
Remove bracket (3) from junction box (4).
END OF TASK
4-72

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business