Click here to make tpub.com your Home Page

Page Title: Install Main Rotor Head and Mast Units (COnt)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1520-238-S
n. Disconnect and Remove Actuator Sup-
r. Install and Connect Main Rotor Track
ports. Disconnect longitudinal, lateral,
and Balance Cable. Obtain main rotor
and collective flight control servoactuator
track and balance cable from airframe in
top rod ends from support end fittings. Re-
main transmission area. Position cable
move stowed rod end hardware. Remove
along right side lateral link (fig. 223) and
actuator supports from top of fuselage.
loosely install two clamps. Connect cable
plug (P57) to main rotor interrupter magnet-
o. Connect Flight Control Servoactuators
ic pickup, and secure the two cable clamps.
to Mixer. Install three rod endtomixer
clevis bolts, washers, bushings, and nuts to
s. Install Air Data Sensor and Deicing
900 1100 InchPounds. Install new cot-
Standpipe. Obtain air data sensor and
ter pin (D15)at torqued nuts.
deicing standpipe from pilot station. Care-
fully insert lower (keyed) end of standpipe
p. Remove Mixer Spreader. If installed,
through rotor hub, aline and fully seat the
slide spreader from side of mixer.
standpipe key in the internal transmission
q. Remove Sling and Crane. Remove
keyway. Then reinstall flexible support and
crane lifting hook from air vehicle sling link
drive plate cover (TM 1-1520-238-23).
and remove crane from the area. Remove
sling pins from main rotor head and detach
the sling.
Change 5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business