Click here to make tpub.com your Home Page

Page Title: Section II. MAINTENANCE ALLOCATION CHART
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

is provided for referencing by code the special tools
original manufacturing standards. Rebuild is the
and test equipment, (sec III) required to perform the
highest degree of materiel maintenance applied to
maintenance functions (sec II).
Army equipment. The rebuild operation includes the
act of returning to zero those age measurement
(hours/miles, etc.) considered in classifying Army
e.  Column (5), Remarks. This column is provided
equipment/components.
for referencing by code the remarks (sec IV)
d.  Column (4), Tools and Equipment. This column
pertinent to the maintenance functions.
Section II. MAINTENANCE ALLOCATION CHART
(3)
(1)
(4)
(5)
(2)
Maintenance functions
Remarks
Assembly Group
Group
Tools and
D
A
B
C
F
J
K
no.
G
H
I
equipment
E
01 Passive Signal Ultrasonic
Processor MX-9443
( )/FSS-9(V)
.
Enclosure . . . . . . . . . .
101
Electronic Board . . . . . . .
102
.
Sensitivity Control . . . . . . . . .
103
02 Passive Signal Ultrasonic
Receiver R-1860
201
Receiver Enclosure . . . . . . . . .
Gain Control . . . . . . . . . . . .
202
Electronic Board . . . . . . . . . .
203
F=Facilities
Engineer
B-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business