Quantcast Figure 19. Rectifier removal and installation

 

Click here to make tpub.com your Home Page

Page Title: Figure 19. Rectifier removal and installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 18. Auto transformer removal and installation.
Up
TM-5-6115-423-15 Load Bank 0-30 KW; AC; Portable Skid Mounted (Sun Electric Corp Model GPT-3D-1) FSN 6115-964-1091 Manual
Next
Figure 20. Relay removal and installation.
TM
5-6115-423-15
(6) If these readings are not obtained,
De-energize the load bank and con-
(4)
replace the control transformer.
nect voltmeter to terminals Xl and
X2.
b. Removal and Installation. Refer to figure
(5) Energize load bank and the voltmeter
23 to remove and install the step down trans-
should read between 24 and 30 volts
formers.
AC.
Figure 19. Rectifier removal and installation
34

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.