Click here to make tpub.com your Home Page

Page Title: Figure 9. Starting load bank
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6115-423-15
Figure 9. Starting load bank.
(b) Add kilowatt by turning the vari-
b. Perform the necessary daily preventive
able switch on and the variable con-
maintenance services ( para 31).
trol knob to a 2 killowatt reading.
18. Operation Under Usual Conditions
(2) Example 2. Apply a load of 2 1/2
a. Insert the plug connector into the proper
kilowatts. Turn the variable control
receptacle as described in paragraph 16, Start-
knob to a reading of 2 1/2 kilowatts.
ing The Equipment.
(3) Example 9. Apply a load of 28 kilo-
b. Combine fixed loads in increments of 3
watts.
KW up through 27 KW and variable loads
infinite variations from 0 to 3 KW. It is possi-
(a) Close all fixed toggle switches (3,
ble to apply any load to the generator under
6, 9, and 9 KW) to apply a load
test from 0 to 30 KW. Several examples of how
of 27 kilowatts.
fixed and variable loads can be combined to
(b) Turn the variable switch on and
achieve types of loading are given here:
turn the variable control knob to
(1) Example 1. Apply a load of 20 kilo-
a 1 KW reading. This adds 1 kilo-
watts,
watt to the 27 kilowatts, giving a
(a) Close fixed load toggle to apply a
total loading of 28 kilowatts.
fixed load of 18 kilowatts. Select
Note. The loads described above as well
either a combination of two 9
as other combinations can be applied to
kilowatt switches or the 3, 6 or 9
any generator capable of being tested by
kilowatt switches.
the bad Bank.
15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business