Quantcast Figure 8-12. Installing first bottom section

 

Click here to make tpub.com your Home Page

Page Title: Figure 8-12. Installing first bottom section
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 8-10. Stacking assembled bottom sections
Up
TM-5-5430-209-12 Tank Steel Vertical Boted Knockdown Sealed Openings Standard Bottom and Roof Gasoline Oil or Water Manual
Next
Figure 8-14. Installing first intermediate bottom section
TM 5-5430-209-12
b. Installing First Bottom Section.
(2) Install finger-tightened nuts on bolts inside the
lap seams. These nuts are to hold assembled section in
(1) Place small end of section over adapter bolts (3,
position.
c. Installing First Intermediate Section.
NOTE
Wedge shaped gaskets must be used
wherever three plates or sections are joined
together.
(1) Place wedge gasket (1, fig. 8-13) over gasket
(2) at right edge of first section.
1. WEDGE GASKET
2. STRIP GASKET
ME 5430-209.12/8-13
Figure 8-13. Installing wedge gasket at lap seam
of first bottom section
(2) Face small end of the section.  Install this
section, and all remaining sections, to the left of the first
section or in a counterclockwise direction around the
tank foundation.
(3) Place small end of first intermediate section (1,
fig. 8-14) over bolts (3, fig. 8-12) with left lap seam of
the section lain over bolts (5) in the right lap seam of the
first bottom section (2, fig. 8-14).
ME GASKET 5430-209-12/8-12
Figure 8-12. Installing first bottom section.
8-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business