Click here to make tpub.com your Home Page

Page Title: NOTES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

NOTES:
a.  Remove curbs, ramps and deck units.
b.  Skid bridge to correct bearing.
c.  Position ex FRB under bridge 3 ft (0.9 m) from new A' peg. Bridge
should overhang ex FRB min.1.5 ft (0.5 m)
d.  Position CRB next to ex FRB.
e.  Add LNCG posts, LNCG, nose roller and install launching nose,
then reposition LRP 12 ft from A peg.
f.  Delaunch bridge until far BSB is 6 ft (1.8 m) from A peg or end of
ETP overhangs CRB by minimum 1.5 ft (0.5 m)
g.  Reposition LRP against new A peg and then remove ex. FRB.
h. Stop boom/delaunch to remove long or short links, light tackle, anti-
flutter and add launching noses as required, obsreving minimum 5ft
(1.5 m) overhang.
i.  Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG Posts and nose
roller.
( ) Center of gravity.
2-74

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business