Click here to make tpub.com your Home Page

Page Title: NOTES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

2E + Bays
13
14
15
16
17
L/Nose
7N1
7N1
7N1
8N1
8N1
Launch
(6p0)
(6p4)
(7p0)
(7p0)
(7p6)
Position
LZ 7
LZ 4
LZ 3
LZ 7
LZ 5
LRP
Note c
Note c
Note c
Note c
Note c
Launch
6p2
Add
PT
PT
Launch
10p6
11p6
12p6
13p6
14p6
Add
PT
PT
PT
PT
PT
Remove
RRB
RRB
RRB
RRB
RRB
FRB
FRB
FRB
FRB
FRB
Launch
13p2
14p2
15p2
16p2
17p2
Add
AA(S)
AA(S)
AA(S)
AA(S)
AA(S)
Launch
Dp2
Dp2
Dp2
Dp2
Dp2
Add
AA(L)
AA(L)
AA(L)
AA(L)
AA(L)
Complete
Note
Note
Note
Note
Note
by:
d, e, f, g
d, e, f, g
d, e, f, g
d, e, f, g
d, e, f, g
NOTES:
a. Add LNCG posts, LNCG and nose roller.
b. Stop boom/launch to add long or short links, light tackle and anti-
flutter as required.
c. Check the LR is under the LZ given or higher. Remove nose
sections as they pass LRP, observing minimum 5 ft. (1.5 m) over
hang. Leave last three nose sections in place until far bank end of
bridge has been lowered to ground.
d. Boom to 6 ft. (1.8 m) from A peg or ETP overhangs CRB by min.
1.5 ft. (0.5 m).
e. Install ex FRB in front of CRB and then reposition LRP 12 ft. (3.6 m)
from A peg.
f. Launch to required far bank bearing or until end of ETP overhangs
Ex FRB by 1.5 ft. (0.5 m).
g. Put bridge on ground.
* Add given length of launching nose with LRP secured with tie-down
strap.
** Nose completed by adding further LNH's.
( ) Center of gravity.
2-63

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business