![]() 2E + Bays 
10 
11 
12 
L/Nose 
6N1 
7N1 
7N1 
8N1 
7N1 
8N1 
Boom 
4p4 
2p6 
3p6 
1p6 
4p7 
3p0 
Remove 
9 
6 
8 
5 
10 
7 
(CG) 
(2p3) 
(Bp0) 
(1p4) 
(Cp0) 
(2p5) 
(Ap2) 
Boom 
4p0 
2p1 
2p6 
3p6 
2p3 
Remove 
8 
5 
7,6 
9,8 
6 
(CG) 
(1p6) 
(Bp5) 
(Bp0) 
(1p4) 
(Bp3) 
Boom 
3p0 
2p6 
1p6 
Remove 
7,6 
7,6 
5 
(CG) 
(Ap2) 
(Cp2) 
(Cp0) 
1p2 
1p2 
1p2 
1p2 
1p2 
Boom 
1p2 
4 
5,4 
8N1,4 
5,4 
8N1,4 
Remove 
(Cp2) 
(Cp2) 
(Cp2) 
(Cp2) 
(Cp2) 
(CG) 
7N1* 
7N1* 
7N1* 
7N1* 
7N1* 
Remove 
6N1* 
3,2 
3,2 
3,2 
3,2 
3,2 
3,2 
Boom 
Bp2 
Bp2 
Bp2 
Bp2 
Bp2 
Bp2 
Remove 
1,E 
1,E 
1,E 
1,E 
1,E 
1,E 
Complete 
Note 
Note 
Note 
Note 
Note 
Note 
by: 
e 
e 
e 
e 
e 
e 
NOTES: 
a. 
Remove curbs, decks and ramps and position FRB under bridge 
min. 1.5 ft (0.5m) from end. 
b. 
Position center of LR (in LRP) 8 ft (2.4 m) from BSB. 
c. 
Add LNCG posts, LNCG and nose roller. Add 3 LHN. Reposition 
LRP [base 9in (23cm) from BSB]. 
d. 
Add remaining nose sections, observing minimum 5 ft (1.5 m) 
overhang. 
e. 
Disassemble FRB and RRB. Clear site. 
* 
Remove entire launching nose, LNCG, LNCG posts and nose 
roller. 
() 
Center of gravity. 
2-53 
 | 
| 
 